Skip to main content

Dell, HP, and Lenovo Devices Found Using Outdated OpenSSL Versions.


OpenSSL Versions

An analysis of firmware images across devices from Dell, HP, and Lenovo has revealed the presence of outdated versions of the OpenSSL cryptographic library, underscoring a supply chain risk.

EFI Development Kit, aka EDK, is an open source implementation of the Unified Extensible Firmware Interface (UEFI), which functions as an interface between the operating system and the firmware embedded in the device's hardware.

The firmware development environment, which is in its second iteration (EDK II), comes with its own cryptographic package called CryptoPkg that, in turn, makes use of services from the OpenSSL project.

Per firmware security company Binarly, the firmware image associated with Lenovo Thinkpad enterprise devices was found to use three different versions of OpenSSL: 0.9.8zb, 1.0.0a, and 1.0.2j, the last of which was released in 2018.

What's more, one of the firmware modules named InfineonTpmUpdateDxe relied on OpenSSL version 0.9.8zb that was shipped on August 4, 2014.

"The InfineonTpmUpdateDxe module is responsible for updating the firmware of Trusted Platform Module (TPM) on the Infineon chip," Binarly explained in a technical write-up last week.

OpenSSL Versions

"This clearly indicates the supply chain problem with third-party dependencies when it looks like these dependencies never received an update, even for critical security issues."

The diversity of OpenSSL versions aside, some of the firmware packages from Lenovo and Dell utilized an even older version (0.9.8l), which came out on November 5, 2009. HP's firmware code, likewise, used a 10-year-old version of the library (0.9.8w).

The fact that the device firmware uses multiple versions of OpenSSL in the same binary package highlights how third-party code dependencies can introduce more complexities in the supply chain ecosystem.

Binarly further pointed out the weaknesses in what's called a Software Bill of Materials (SBOM) that arises as a result of integrating compiled binary modules (aka closed source) in the firmware.

"We see an urgent need for an extra layer of SBOM Validation when it comes to compiled code to validate on the binary level, the list of third-party dependency information that matches the actual SBOM provided by the vendor," the company said.

"A 'trust-but-verify' approach is the best way to deal with SBOM failures and reduce supply chain risks."

Comments

Popular posts from this blog

UGANDA ELECTORAL COMMISSION TO ELIMINATE NATIONAL IDENTIFICATION CARDS (IDs) FOR 2021 GENERAL ELECTIONS.

The elimination of using National IDs (Ndagamuntu) for the 2021 elections should not have come as a surprise. One would be very NAIVE to think that Bobi Wine has not prepared for this in his Business Plan under the RISK section. It is public knowledge that our EC is not independent.  It is also public knowledge that Military Dictator Yoweri Museveni will never lose an election. What stunned us this morning is when we noticed that on social media, people were mocking Bobi with his "get your Ndagamuntu".  We are on record for saying to all Our readers that the National ID is like Apartheid in South Africa. Students of History would know how those IDs were being used to arrest people, deny them jobs, deny them basic services. Consequently, Bobi was not wrong and will never be wrong on the Ndagamuntu. Except the ones attacking him and mocking him forget that in Uganda, now, no National ID (Ndagamuntu), no service.  If you have not been denied registering your child i...

UPDF has Rehabilitated Boreholes and Shallow Wells in Maracha District Ahead of 45th Tarehe Sita.

Story by Osuta Yusuf. Maracha District.  30-12-2025. 📸: The technical team fixing some of the  boreholes. Photo by Osuta Yusuf, Our News Reporter. The Uganda Peoples Defence Forces (UPDF) which is the legally constituted security organ to guard and protect the people, properties and sovereignty of Uganda, have rehabilitated a total of 9 Boreholes and shallow wells at the tune of 15m Shs in 7 Sub-counties out of the 19 Sub-counties in Maracha District through a service dubbed under the Theme of “QUICK IMPACT PROJECT” directly financed by the UPDF, ahead of preparation for the celebration of their next year's 2026 Tarehe Sita anniversary. 📸: Official launch of UPDF’s 45th Tarehe Sita celebration ahead of the due date 6-February-2026. Courtesy Photo. The UPDF Tarehe Sita is an annual public holiday and event that takes place on every 6th of February, the date when the then Uganda Patriotic Movement (UPM) party now turned as National Resistance Army / Movement (NRA / M) headed b...

Parliament Urges Government to Provide Shs 4 Billion to Media Houses to Run Awareness Campaign on Tourism in Uganda.

Parliament also urged Gov’t to provide additional Shs4Bn to UTB to engage international and national media houses in production of positive media stories for improved destination image, following reports of drop in number of tourists from US, Europe and China visiting Uganda. "The National Development Plan targeted to cumulatively attract 281,760 International Tourist arrivals from US, Europe & China but only 67,252 arrivals were registered by the end of the first half of FY 2023/24. The U.S, Europe & China were key target source for leisure tourist who stay longer than business tourists. However, statistics show that international arrivals from the aforementioned areas have continue to drop. The UTB requires Shs4Bn to engage international & national media houses in production of positive tourism stories to improve destination perception in light of recent controversies that shade the destination in a bad light. However, this has remained unfunded,” said La...